LLANGOLLEN RAILWAY - OPERATING DEPARTMENT

TRAFFIC NOTICE: 11/10

PERIOD: from 12th July to 25th July

 

Carriage Cleaning

To facilitate the cleaning of carriages on the River Side at Llangollen Station the set is to be moved to P2 at the end of the day on Tuesdays. The only exception to this is if an Evening Summer Ramble is operating.

 

Timetable

 

Monday 12th July

A Service

Tuesday 13th July

A Service – stock to be moved to P2 at end of day for carriage cleaning

Wednesday 14th July

A Service plus Summer Evening Ramble

Thursday 15th July

A Service

Friday 16th July

A Service

Saturday 17th July

B Service

Murder Mystery in evening – 1 round trip from Llangollen

Sunday 18th July

C Service – Carrog Box open

Steam Driver Experience – 3 round trips

Monday 19th July

A Service – stock to be moved to P2 at end of day for carriage cleaning

Tuesday 20th July

A Service plus Summer Evening Ramble

Wednesday 21st July

A Service

Thursday 22nd July

A Service

Friday 23rd July

A Service

Saturday 24th July

Ivor the Engine – Special timetable in operation

Evening concert at Llangollen Station with Ivor as Light Engine

RO: Andrew Gardiner (07812-039114)

Sunday 25th July

Ivor the Engine – Special timetable in operation

RO: Andrew Gardiner (07812-039114)

 

Traffic Notice 11-10

 

Steam Engine Water Supplies

Use river water from P2 column whenever possible. Ensure engine always filled before going back to shed. Use town main supply in yard only as last resort. (Water Quality)

 

Pentrefelin Yard

Entry by Steam or Diesel Engines.
No tender engine or large Diesel loco is to go beyond entrance gates unless authorised by CME. Tank engines, Diesel shunters, Type 2 diesels may enter without reference, provided each point is checked that the blade is firmly against stock rail and check rails/frogs are clear before passing over it.

 

Number 7 and 8 sidings. (Nearest river)
Under no circumstances shall any person be positioned between roads 7 & 8 during shunting operations due to lack of adequate clearance. (HMRI requirement)

 

Shunting of Autocoaches in No 8 Road Pentre Felin. (No 8 Road is the Dee River side.)
Following report of a buffer-lock please ensure that no other vehicle is ahead of autocoaches when shunting this siding.
 

 

PERMANENT SPEED RESTRICTIONS

 

 

No. 11 Points by Green Lane bridge  10 mph. both directions

Llangollen station approach

 

Llangollen Green Lane bridge to   15 mph both directions

Goods Junction

 

Goods Junction                5 mph  both directions

Reverse curves at each end of loop.    

 

Deebridge      10 mph both directions

 

Deeside Loop west end points   5 mph  up direction

(Into loop)

 

Deeside Loop Up and Down lines.  15 mph both directions

Between east and west points

 

Glyndyfrdwy platform loop points  10 mph both directions

East and West ends

 

Entry to Carrog Down platform   15 mph down direction

 

Andrew Gardiner

Mobile 07812 039114  E-mail ajgardiner@btopenworld.com

9th July 2010

 

LLANGOLLEN RAILWAY – SECTION C NOTICE

NEW/REPLACEMENT SIGNAL AT LLANGOLLEN GOODS JUNCTION

The double disc/shunting signal at Llangollen Goods Junction, controlled by Pentre Ground Frame, which applied to Down movements from the Back Road to the Down Main or Pentre Road has been replaced with a single disc/shunting signal.

The new signal has a black background and a yellow stripe.

It can be passed in the ‘On’ position provided that the points are set for Pentre Road.

When the points are set for the Down Main it can only be passed when in the ‘Off’ position.

 

 

Andrew Gardiner,
Operations Director,
14th July 2010

 

LLANGOLLEN RAILWAY - OPERATING DEPARTMENT

TRAFFIC NOTICE: 12/10

PERIOD: from 26th July to 8th August

 

Carriage Cleaning

To facilitate the cleaning of carriages on the River Side at Llangollen Station the set is to be moved to P2 at the end of the day on Tuesdays. The only exception to this is if an Evening Summer Ramble is operating.

 

Timetable

 

Monday 26th July

A Service

Diesel Test Train operating after end of public service – Llangollen to Glyndyfrdwy

Tuesday 27th July

A Service – stock to be moved to P2 at end of day for carriage cleaning

Wednesday 28th July

A Service

Thursday 29th July

A Service

Friday 30th July

A Service plus Summer Evening Ramble

Saturday 31st July

1960’s Weekend – Special timetable in operation

RO: Andrew Gardiner (07812-039114)

Sunday 1st August

1960’s Weekend – Special timetable in operation

RO: Andrew Gardiner (07812-039114)

Monday 2nd August

A Service plus Summer Evening Ramble

Tuesday 3rd August

A Service – stock to be moved to P2 at end of day for carriage cleaning

Wednesday 4th August

A Service plus Summer Evening Ramble

Thursday 5th August

A Service

Friday 6th August

A Service

Saturday 7th August

Thomas - Special timetable in operation

RO: Andrew Gardiner (07812-039114)

Sunday 8th August

Thomas - Special timetable in operation

RO: Andrew Gardiner (07812-039114)

Traffic Notice 11-10

 

Steam Engine Water Supplies

Use river water from P2 column whenever possible. Ensure engine always filled before going back to shed. Use town main supply in yard only as last resort. (Water Quality)

 

Pentrefelin Yard

Entry by Steam or Diesel Engines.
No tender engine or large Diesel loco is to go beyond entrance gates unless authorised by CME. Tank engines, Diesel shunters, Type 2 diesels may enter without reference, provided each point is checked that the blade is firmly against stock rail and check rails/frogs are clear before passing over it.

 

Number 7 and 8 sidings. (Nearest river)
Under no circumstances shall any person be positioned between roads 7 & 8 during shunting operations due to lack of adequate clearance. (HMRI requirement)

 

Shunting of Autocoaches in No 8 Road Pentre Felin. (No 8 Road is the Dee River side.)
Following report of a buffer-lock please ensure that no other vehicle is ahead of autocoaches when shunting this siding.
 

 

PERMANENT SPEED RESTRICTIONS

 

 

No. 11 Points by Green Lane bridge  10 mph. both directions

Llangollen station approach

 

Llangollen Green Lane bridge to   15 mph both directions

Goods Junction

 

Goods Junction                5 mph  both directions

Reverse curves at each end of loop.    

 

Deebridge      10 mph both directions

 

Deeside Loop west end points   5 mph  up direction

(Into loop)

 

Deeside Loop Up and Down lines.  15 mph both directions

Between east and west points

 

Glyndyfrdwy platform loop points  10 mph both directions

East and West ends

 

Entry to Carrog Down platform   15 mph down direction

 

Andrew Gardiner

Mobile 07812 039114  E-mail ajgardiner@btopenworld.com